China Building Glass Factory – Unitized Glass Curtain Wall System External Wall Design Proposal Overseas Installation Deshion Construction Contractor – Deshion
China Building Glass Factory – Unitized Glass Curtain Wall System External Wall Design Proposal Overseas Installation Deshion Construction Contractor – Deshion Detail:
Characteristics of Unitized Curtain Wall
The main factors leading to the deflection of the main structure of civil construction are: the construction error of civil construction, the uneven settlement, the existence of microseismic after use, deformation in the earthquake. The unitized curtain wall is inserted through the slots between each adjacent plate and has good expansion and deformation capacity
Each unit plate of the unitized curtain wall is a whole, so the relative displacement of each unit component is extremely small, and the integrity of the plate can still be guaranteed after the expansion and deformation reset.
Since the unit body is assembled in the factory and can be installed directly after being transported to the site, without occupying a lot of space on the site and only accounts for about 30% of the stick curtain wall, which avoids long-term stacking and effectively reduces the loss rate of semi-finished products.
Characteristics of Unitized Exposed Frame Curtain Wall, Unitized Hidden Frame Curtain Wall, Unitized Half-Hidden Frame Curtain Wall
01 |
Unit plates are all completed in the factory workshop with high assembly accuracy. |
02 |
Fast installation speed, short construction period, easy to protect finished products. |
03 |
It can be constructed synchronously with the main structure of civil construction, which is beneficial to shorten the whole construction period. |
04 |
The structure adopts the principle of decompression step by step, and the drainage system is set inside, which have good performance of preventing rain seepage and air infiltration. |
05 |
Plate joints are all sealed with special aging resistant rubber strips, which makes the curtain wall has self-cleaning function and the surface is less polluted. |
06 |
The plates are connected by plate grafting, with strong seismic capacity |
Independent Units Glass Curtain Wall
Standard products |
It can be installed and disassembly freely |
Structure features |
The glass is mainly subjected to wind pressure by the hook plate on the four sides. The design of structural sealant makes the structure have double safety protection function |
Architectural effect |
The outer line of sight is concise and lively, with good permeability |
Application |
It can achieve large partition plate, which is suitable for airport, exhibition hall and other huge building |
Composition Principle
1.assemble each element (mullion, horizontal frame) into unit component frame in the factory, and install curtain wall panel (glass, aluminum plate, stone, etc.) on the corresponding position of unit component frame to form element composites.
2.Transport the component assembly to the site and directly fix it on the main structure by hoisting.
3.The upper and lower frames (left and right frames) of each unit component are inserted to form a combination rod and complete the joints between the unit components, eventually forming the whole curtain wall.
Stick And Unitized Curtain Wall Flow Chart
Unitized Curtain Wall Lifting
Stick Curtain Wall Installation
Unitized Curtain Wall Lifting
Stick Curtain Wall Installation
Waterproof Performance
*Unitized curtain wall adopts “isobaric principle”, waterproof performance is good
Insulation Design of Unitized Curtain Wall
Curtain Wall And Glass Testing
Curtain wall with lighting function requirements, the transmittance reduction factor should not be less than 0.45. Curtain wall with color discrimination requirements, its color perspective index should not be lower than Ra80
The curtain wall shall be able to support its own weight and the weight of various accessories in the design, and can be reliably transferred to the main structure
The maximum deflection of the horizontal stressed member within the span at both ends of a single panel under standard dead weight should not exceed 1/500 of the span at both ends of the panel, and not exceed 3mm
Curtain wall tempered glass should be processed by hot dip. Secondary heat treatment, soaking heat treatment, detonation treatment, “after treatment can be less than 1/1000 of the self-explosion rate” is commonly used in engineering
Infrastructure is an integral part of urban development, Deshion can also provide you with one-stop solutions for municipal engineering
Municipal Guardrail
Public Utilities
Facility Fence Mesh Series
Municipal Guardrail
Municipal Guardrail
City Road Guardrail
Sidewalk Guardrail
Noise Barrier Series
Corrugated Beam Guardrail
River Guardrail
Municipal Facilities Park Guardrails
The application of municipal guardrails in our lives is very common. Guardrails not only play a protective role, but also play a decorative role.
There are many kinds of municipal guardrails, and the functions of different guardrails are different, and we can customize the function and appearance according to your needs.
Public Utilities
Public Utilities
Bus Platform
Steel Structure Gazebo
Sidewalk Awning
Park Benches
Bicycle Parking Rack
Public Fitness Facilities
The role of public facilities is to meet people’s public needs (such as convenience, safety, participation) and the choice of public space.
Facility Fence Mesh Series
Facility Fence Mesh Series
Double Wire Fence
Chain Link Fence
Double Horizontal Wire Fence
Y-Shaped Safety Fence
Temporary Fence
Highway Anti-Glare Fence
Fences are usually made of high-strength welded wire mesh or weaving technology (Chain Link Fence), which has the characteristics of simple structure, convenient installation, strong durability and so on.
It is often used for large-area enclosures of roads, railways, green belts, stadiums, airports, farms, construction sites, border ports, municipalities and other venues.
Packaging & Shipping
Free Customized Design
We design complex industrial buildings for clients using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures(Xsteel)and etc.
Customization Process
Production Workshop Overview
Iron Workshop
Raw Material Zone 1
Aluminum Alloy Workshop
Raw Material Zone 2
Robotic Welding Machine Installed In New Factory
Automatic Spraying Area
Multiple Cutting Machines
Certification Authority
Cooperative Company
FAQ
1.What’s your manufacturing time?
38-45 days depends upon down payment received and shop drawing signed
2. What makes your products different from other suppliers?
Strictly quality control and very competitive price as well as professional sales and installation engineering services.
3. What is the quality assurance you provided and how do you control quality?
Established a procedure to check products at all stages of the manufacturing process – raw materials, in process materials, validated or tested materials, finished goods, etc
4. How to get the accurate quotation?
If you can provide the following project data, we are able to offer you with accurate quotations.
Design code/ design standard
Column position
Maximum wind speed
Seismic load
Maximum snow speed
Maximum rainfall
Product detail pictures:
Related Product Guide:
No matter new buyer or old purchaser, We believe in long expression and trusted relationship for China Building Glass Factory – Unitized Glass Curtain Wall System External Wall Design Proposal Overseas Installation Deshion Construction Contractor – Deshion , The product will supply to all over the world, such as: Adelaide, Holland, Los Angeles, As an experienced manufacturer we also accept customized order and we could make it the same as your picture or sample specification. The main goal of our company is to live a satisfactory memory to all the customers, and establish a long term business relationship with buyers and users all over the world.
By Liz from St. Petersburg - 2017.04.08 14:55
We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
By Rosemary from Peru - 2018.07.27 12:26