• Interior design decoration of structure of twisted Bridge. Structure in Dubai, United Arab Emirates or UAE. Wooden floor in tunnel. Architecture background. Hall corridor in futuristic empty room.

High-Quality Metal Fabrication Suppliers – Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure – Deshion

High-Quality Metal Fabrication Suppliers – Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure – Deshion

Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

We pursue the administration tenet of "Quality is superior, Services is supreme, Standing is first", and will sincerely create and share success with all customers for Frameless Glass Curtain Wall , Tempered Glass Sliding Door , Unitised Curtain Wall Installation , We feel that our warm and professional support will bring you pleasant surprises as perfectly as fortune.
High-Quality Metal Fabrication Suppliers – Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure – Deshion Detail:

Characteristics of Truss Structure

The truss is composed of steel tubes, strong carrying capacity in cross section and the cross section can be bent to curve modeling. Beautiful appearance, simple internal space, often used in public buildin

Steel-truss-structure-T01

Stress of Truss Structure

Truss is actually a plane stress system, similar to frame structure, each stress plane system is connected through the longitudinal truss, as a longitudinal support, and also ensure the overall stability of the truss

Steel-truss-structure-T02

Fabrication of Truss Structure

Trusses usually use triangular section, which makes the trusses have better rigidity in both directions and is convenient for production
The girdle of the truss and the chord are connected by intersecting line cutting and welding, and the chord must be bent into the curved shape required by the design in advance.

Steel-truss-structure-T03

Site Assembling of Truss Structure

The truss section are usually large, the components are too wide to be transported and very uneconomical, in hence, all the truss are welded on the site and heavy workload on site

Steel-truss-structure-T04

Truss is large span and heavy component, it’s generally constructed on the floor when used in public buildings such as airports and exhibitions. Large machinery is not allowed to enter into, other types of spatial structure construction is basically limited by site conditions, so the construction is more complex, site lifting, welding workload is large.

Steel-truss-structure-T05

Commonly used pipe truss construction methods include large mechanical lifting, high altitude bulk, high altitude sliding, integral lifting and so on.

Steel-truss-structure-T06-G

Free Customized Design

We design complex industrial buildings for clients using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures(Xsteel)and etc.

Free Customized Design (1)
Free Customized Design (3)
Free Customized Design (2)

Main Products

Steel Prefab Warehouse

Steel Prefab Warehouse

Steel Prefab Hangar

Steel Prefab Hangar

Steel Prefab Stadium

Steel Prefab Stadium

Bailey Bridge

Bailey Bridge

Station

Station

Exhibition Hall

Exhibition Hall

Customization Process

Multi-story-steel-structure-general-1237

Production Workshop Overview

Iron Workshop

Iron Workshop

Raw Material Zone 1

Raw Material Zone 1

Aluminum alloy workshop

Aluminum Alloy Workshop

Raw Material Zone 2

Raw Material Zone 2

Robotic welding machine installed in new factory.

Robotic Welding Machine Installed In New Factory

Automatic Spraying Area

Automatic Spraying Area

Multiple cutting machines

Multiple Cutting Machines

Production Process

1.Prepare Material

1.Prepare Material

2.Cutting

2.Cutting

3.Joint

3.Joint

4.Automatic Sub-merged Arc welding

4.Automatic Sub-Merged Arc Welding

5.Straightening

5.Straightening

6.Parts Welding

6.Parts Welding

7.Blasting

7.Blasting

8.Coating

8.Coating

Quality Control

Ultrasonic weldina inspection a

Thickness Detection

Ultrasonic welding inspection

Ultrasonic Welding Inspection

CS03

Spray Paint Inspection

CS01

Welding Inspection

Packaging & Shipping

Plastic-film-packaging
Wooden-frame
Loading
Oversized-cargo-barge-transportation

Certification Authority

certificate1
certificate2
certificate3
certificate4
certificate5
certificate6
certificate7
Certificate8
certificate9

FAQ

Q: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

 

Q: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

 

Q: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years.

 

Q: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure
Normal anti-rust paint
Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish
Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure.

 

Q: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge.
Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.

 

Get the Price
Please kindly inform us of the information below if you are interested in our products.
1. Usage: For warehouse, workshop, showroom and etc.
2. Location: Which country or area?
3. Size: Length*width*height (mm)
4. Wind load: max Wind speed (kn/m2, km/h, m/s)
5. Snow load: max Snow height (kn/m2, mm)
6. Anti-earthquake level?
7. Brick wall needed or not?
If yes, 1.2m high or 1.5m high
8. Thermal insulation needed or not?
If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested.
If not, the metal steel sheets will be more affordable.
9. Quantity (unit) and size (width*height) of doors and windows.
10. Crane needed or not?
If yes, quantity (units), max Lifting weight (tons), max Lifting height (m).

 

Cooperative Company

Cooperative company (1)
Cooperative company (10)
003G
004GG
005G
Cooperative company (9)
Cooperative company (4)
009G
008G
Cooperative company (6)


Product detail pictures:

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures

High-Quality Metal Fabrication Suppliers –  Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure  – Deshion detail pictures


Related Product Guide:

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate inside our success for High-Quality Metal Fabrication Suppliers – Space Frame Steel Truss Stadium Steel Structure & Steel Roof Structure – Deshion , The product will supply to all over the world, such as: Mauritania, European, Guatemala, We've got won a good reputation among overseas and domestic clients. Adhering to the management tenet of "credit oriented, customer first, high efficiency and mature services", we warmly welcome friends from all walks of life to cooperate with us.
  • The company can keep up with the changes in this industry market, product updates fast and the price is cheap, this is our second cooperation, it's good.
    5 Stars By Tina from San Francisco - 2017.12.31 14:53
    The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Josephine from Ukraine - 2017.06.22 12:49